State/Municipal

Monroe County Central Gates Pump Station

The Central Gates waste water pump station consists of two separate wet wells and two separate pumping systems which were installed several years apart. This dual station configuration was originally designed to accommodate both normal flows and storm overflow. The storm flows predicted for the area never materialized and the wet weather pumps proved to be grossly oversized. This renovation addressed replacement of the aging normal flow pump station and resizing the storm water pumps to match actual flow conditions. Pathfinder provided mechanical and electrical engineering design for upgrades for this project.

View Project Sheet

Monroe County Central Gates Pump Station Image 1